News Flash

Home

2 Stories
Posted on: November 21, 2023

Water Lines Customer Survey

drop-of-water-200x133

The goal of these changes is to identify and remove all lead pipes in the drinking water system. The water supplier must identify all construction materials used on both the supplier's AND the customer's side of the water meter, which me...

Read on...

Home
Posted on: September 22, 2022

East 6th Street Bridge repair

East6thstreetbridgedetour

This project will remove and replace the existing bridge structure on US-40B. The roadway will be closed, and traffic will be directed to detour using I-70. A single lane in each direction will re-opened by November 2023.  The project is expected...

Read on...

Construction Updates Home